Day 29 - Concrete Oversite

The concrete was dry enough to walk on today.

Photo 1

Photo 2

Photo 3
The concrete was also poured into the new living room (former dining room).
Photo 4
Photo 5
The small shower room was also concreted. The walls on either side will be removed once the structural steels are installed.
Photo 6
The foundation masonry also commenced on the garage. After weeks of seeing just soil, trenches and rubble, the structure is finally beginning to emerge.




Comments

Popular posts from this blog

Windows and Doors

Day 125 - Enabling Works

Day 59 - Brickwork