Day 48 - Structural Works
The builders were on site again, and by midday the corner post and an internal beam B4 had finally been installed.
By the end of the day, the entire side wall had been removed.
The new extension now finally seems connected to the existing house.
The vertical sash box completely removed.
Strongboys in position for removing the rear wall.
The post in position, this should be bolted to the concrete pad that is sits on.
This is where the beam B2 is welded to B4.