Day 57 - Brickwork

Temperature is starting to get close to freezing now so hoping our brickie can finish the brickwork soon.

Photo 1

Photo 2

Photo 3
The brickwork has reached the corner between the bi-folds and patio doors. This side of the extension doesn't have a lot of brickwork so hopefully it doesn't take the brickie too long.

Photo 4

Photo 5
Due to the falling temperatures, the brickwork has to be covered with this hessian cloth to protect it from frost.

Comments

Popular posts from this blog

Windows and Doors

Day 125 - Enabling Works

Day 59 - Brickwork