Day 57 - Brickwork

Temperature is starting to get close to freezing now so hoping our brickie can finish the brickwork soon.

Photo 1

Photo 2

Photo 3
The brickwork has reached the corner between the bi-folds and patio doors. This side of the extension doesn't have a lot of brickwork so hopefully it doesn't take the brickie too long.

Photo 4

Photo 5
Due to the falling temperatures, the brickwork has to be covered with this hessian cloth to protect it from frost.

Comments

Popular posts from this blog

Introduction

Day 12 - Digging Foundations

Day 59 - Brickwork