Today was spent clearing all the rubble from the two bedrooms where the plaster and wallpaper was removed. In addition I had someone demolish the wardrobe and cold water storage area in the attic rooms.
|
Photo 1 |
Bedroom 1 with plaster removed form exterior walls, architrave removed from windows and picture rail also removed.
|
Photo 2 |
|
Photo 3 |
|
Photo 4 |
Photos 3 and 4 show bedroom 2 with the plaster removed from the exterior walls and wallpaper removed from the interior wall. Picture rail, skirting and architrave from windows were also removed. The 2 bedrooms are now ready to have their exterior walls insulated and first fix wiring to start.
|
Photo 5 |
|
Photo 6 |
|
Photo 7 |
|
Photo 8 |
Photos 5 to 8 show the first floor hallway with the wallpaper removed. The wallpaper on the staircase leading downstairs below the dado-rail was particularly difficult to remove. It was actually cardboard with an embossed pattern that had been painted over a couple of times.
|
Photo 9 |
|
Photo 10 |
There is still the ground floor hallway and 4 rooms that require wallpaper stripping, so still lots of work to be done.
|
Photo 11 |
Photo 11 shows the fitted wardrobe removed from the attic room.
|
Photo 12 |
Photo 12 shows the cold water tank cabinet removed from the adjacent attic room.
The next task is clearing the attic rooms of the rubble.