Day 67 - Enabling Works

Today was spent clearing all the rubble from the two bedrooms where the plaster and wallpaper was removed. In addition I had someone demolish the wardrobe and cold water storage area in the attic rooms.

Photo 1
Bedroom 1 with plaster removed form exterior walls, architrave removed from windows and picture rail also removed.
Photo 2

Photo 3

Photo 4
Photos 3 and 4 show bedroom 2 with the plaster removed from the exterior walls and wallpaper removed from the interior wall. Picture rail, skirting and architrave from windows were also removed. The 2 bedrooms are now ready to have their exterior walls insulated and first fix wiring to start.
Photo 5

Photo 6

Photo 7

Photo 8
Photos 5 to 8 show the first floor hallway with the wallpaper removed. The wallpaper on the staircase leading downstairs below the dado-rail was particularly difficult to remove. It was actually cardboard with an embossed pattern that had been painted over a couple of times.
Photo 9

Photo 10
There is still the ground floor hallway and 4 rooms that require wallpaper stripping, so still lots of work to be done.

Photo 11
Photo 11 shows the fitted wardrobe removed from the attic room.

Photo 12
 Photo 12 shows the cold water tank cabinet removed from the adjacent attic room.


 The next task is clearing the attic rooms of the rubble.




Comments

Popular posts from this blog

Windows and Doors

Day 125 - Enabling Works

Day 59 - Brickwork