Day 80 - Enabling Works

As our bricklayer is off for a few days, there isn't any construction work happening but I've been trying to get the inside prepared for first fix.

Photo 1

Photo 2

Photo 3

Photo 4

Photo 5
Removing the green paneling that can be seen in photo 2, is proving very challenging and requires removing a thin layer of plaster with it. Photo 3 shows the patches of plaster once the paneling has been removed, with photo 4 showing how the wall looks once the patches of plaster have been chiseled off. Its become a very time consuming task and as photo 5 shows there is still a fair bit to remove.

Photo 6

Photo 7
Spent some time cleaning the extension and adjoining living room. I'm hoping I can use the living room to store the insulation boards required for insulating the walls, ceilings and floor/