Day 123 - Brickwork


 Brickie was back on site today to create the doorway between the master bedroom and walk-in closet above the garage.

Photo 1

Photo 2
Photo 3
 Creating the opening using an angle grinder produced unbelievable amount of dust.

Photo 4

Photo 5
This will be the doorway from the master bedroom into the walk-in closet/dresser and en-suite above the garage. Due to the height constraints, we will require some steps down from the bedroom.




Comments

Popular posts from this blog

Windows and Doors

Day 125 - Enabling Works

Day 59 - Brickwork