Day 11 - Digging Foundations

Wales and West Utilities (WWU) were scheduled to come and move the gas meter to a new location as it was currently on a wall that was being demolished. So at 08:30 the team from WWU turned up and confirmed where the new meter was being installed. They asked the groundworkers to dig the trench where the gas pipe was and went about their work. By 10:00 the gas pipe had been altered and a new meter box situated on the side of the house before the garage entrance.
Photo 1

Photo 2

Photo 3

Photo 4

Photo 5

Photo  6

Photo 7

Photo 8
Its not the most ideal location but it will have to do.
Photo 9

Photo 10

Photo 11

Photo 12
Photos 9 to 11 show the drainage being installed. Photo 12 shows the trench for the drainage as it comes towards the front of the property. The drainage runs right around the outside of the extension and then has to run under the garage as it joins the public sewer from the front.
Photo 13
Photo 13 shows the trench for the foundation of the garage side will that sits on the boundary of the neighbour.


Comments

Popular posts from this blog

Windows and Doors

Day 59 - Brickwork

Day 125 - Enabling Works