Day 10 - Digging Foundations

Having met and spoken with the neighbour, he requested the boundary wall be knocked down so as there is only the garage wall visible from his side and he gains a few inches of space to make it easier to get in and out of his car. It also makes it easier for us to build the wall without having to build from the inside. Photo 1 below shows the wall removed.

Photo 1
Photo 2
 Some hard-core was also delivered which will be used for the drainage.
Photo 3
Another couple of grab-lorries have removed the waste at the front.

Photo 4

Photo 5
Photo 5 shows the delivery of blocks. These will be laid on the concrete footings and hopefully we should start seeing the shape of the extension.

Photo 6
The small shower room has now been completely cleared and the floor removed.