Today the builders focused on positioning the outlets for the drainage, where the soil pipes (toilets), waste water pipes (showers, sinks) and rainwater pipes will connect to.
|
Photo 1 |
Photo 1 shows where the first inspection chamber at the point where the main drain line begins. From the left there are connections for rainwater, followed by two for the cloakroom for the toilet, wash-basin and shower. The next one is for the existing rainwater pipe and the last one has the existing soil vent pipe connected to it.
|
Photo 2 |
This photo shows the second inspection chamber as the drain line bends.
|
Photo 3 |
Photo 3 shows where the drain line turns 135 degrees to go down the back of the extension. There is also a connection for the rainwater.