Day 105 - Garage
Brickie was on site again, meaning more labouring for myself. Managed to create the opening for the en-suite window above the garage.
Having the garage joists fitted allowed the bricklayer to raise the blockwork.
Our carpenter was also on site, and constructed the lowered ceiling. This will hide some of the steels.
Photo 1 |
Photo 2 |
Photo 3 |
Photo 4 |
Our carpenter was also on site, and constructed the lowered ceiling. This will hide some of the steels.
Photo 5 |
Photo 6 |
Photo 7 |
Comments
Post a Comment