We've been away for two weeks, but I've now decided on a company to carry out the groundworks and take me up to DPC. I did consider hiring someone with a digger to clear the site and dig the foundations which would have saved me a good amount of money but as we've already lost a lot of time and with family commitments I decided to give the entire groundworks to someone else. This is a list of the tasks I'm expecting the contractor to have completed: Demolition of all out buildings. Demolition of utility and kitchen saving the bricks Remove all waste Dig footings 600mm wide and 1000mm deep. Remove spoil. Dig oversite down to required level and remove spoil including internal breakfast and dining rooms and hallway. - Dining room doesn’t require digging as it has a suspended floor with a 650mm void. Supply and lay concrete foundations Supply and lay concrete blocks up to DPC Supply and lay all internal drainage Supply and lay all storm and foul drainage. Re...
Brickwork has been progressing on the garage. The difficulty has been finding and cleaning the best of the salvaged bricks to reuse. Photo 1 Photo 2 Photo 3 Photo 4 Photo 5 Photo 6 Photo 7 Previous Next
Comments
Post a Comment