Day 14 - Foundation Masonry

Photo 1

Photo 2

Photo 3
 Photos 1 to 3 show the old breakfast room with the plaster removed from the wall to a height of 1m in preparation for the damp proofing.
Photo 4
Sand and cement ready for mixing mortar for the block-work.
Photo 5

Photo 6
Photos 5 and 6 show the damp proof paint applied to the brickwork.

Photo 7

Photo 8

Photo 9
 Photos 7 to 9 show the masonry block-work started for the foundation. This will all be below ground level so not visible.
Photo 10
Hard-core delivered ready to be put down for the oversite.