Day 30 - Foundation Masonry

Work continued on the foundation masonry today after last Friday was a complete washout. We are expecting heavy downpours over the next few days so not sure how much we are going to progress.
Photo 1

Photo 2
Photos 1 and 2 show the garage. The drainage pipe adjacent to the gas meter will take rainwater from a down-pipe and connect into the main drain via the inspection chamber. The bend visible inside the garage will take the foul-water from the en-suite above the garage. The pipe coming down from the en-suite will need to be boxed in but being in the corner of the garage is an acceptable compromise.

Photo 3

Photo 4
Photos 3 and 4 show the kitchen area. The diagonal waste pipe is to take the waste-water from the sink and dishwasher that will be situated within the kitchen island.
Photo 5

Photo 6
Photos 5 and 6 show the new dining area but a part of it will be partitioned for the utility area.








Comments

Popular posts from this blog

Refining Our Design

Windows and Doors

Day 126 - Structural Works