Day 36 - Structural Works

Today, work began on the structural alterations, removing sections of the wall where steel beams are to be installed.

Photo 1

Photo 2
Photo 3

These photos show the wall removed between the old dining room (to be living room) and breakfast room (to be kitchen). Due to the height of the ceilings, you can see that the strong-boys had to be raised. The opening is 2.2m which looks narrow in photo 2 due to the height of the rooms.

Comments

Popular posts from this blog

Windows and Doors

Day 125 - Enabling Works

Day 59 - Brickwork