Day 93 - Plumbing

First floor pipes have been laid to required locations, so the plumber spent today on the second floor.
Photo 1

Photo 2

Photo 3
In addition, we've had a change of plan for the bathroom on the second floor. Creating the bathroom within the store room space always felt a little squashed as there wasn't much head room. Now that we had removed the fitted wardrobe from bedroom 5, there was additional space which could be made better use of.
Photo 4
By moving the bedroom door to the right, we could add another door in the hallway and create the bathroom by partitioning the bedroom. The only concern was how to route the soil pipe.

Photo 5
Finally, there were still a couple of cables that were proving difficult to remove and it wasn't until we lifted the floorboard on the staircase landing that we discovered the contents on photo 5 which were duly removed.