Carpenter was onsite early morning and it didn't take very long to get the framing for the second floor bathroom up.

Photo 1

Photo 2

Photo 3
Photo 4
Quite a transformation. The bathroom space is about 2m wide and 2.7m long.

Photo 5

Photo 6

Photo 7
The stud frame for the utility room was also built. We decided to have the corner on a 45 degrees angle so as to give more clearance between the kitchen island and the wall.