Day 95 - Carpentry
Carpenter was onsite early morning and it didn't take very long to get the framing for the second floor bathroom up.
Quite a transformation. The bathroom space is about 2m wide and 2.7m long.
Photo 1 |
Photo 2 |
Photo 3 |
Photo 4 |
Photo 5 |
Photo 6 |
Photo 7 |
The stud frame for the utility room was also built. We decided to have the corner on a 45 degrees angle so as to give more clearance between the kitchen island and the wall.