Day 97 - Insulation

Today was spent fitting insulation between the rafters. This took a lot longer than expected, firstly as the gaps between the rafters are not consistent, so each board had to be measured and then trimmed as the distance between the top and bottom also differs. Secondly, the boards were too big to carry into the attic rooms which meant measuring, then down a flight of steps to cut, then carry the board back up to fit.