Day 96 - Steelworks
We are planning to lower the ceiling to hide some of the steels, but prior to that the steels need to be fire boarded. The first step was to prime them with red-oxide paint which should've been done a while back when they were fitted.
Photo 1 |
Photo 2 |
Photo 3 |
Photo 4 |
Comments
Post a Comment